Agent StoreInformation TechnologyBusiness Continuity
Live

Disaster Recovery Test Coordination Agent

Information TechnologyBusiness Continuity

Plans, schedules, and validates disaster recovery failover tests across critical systems to confirm recovery objectives are actually met.

4
Process steps
6
Integrations
3
Data inputs

Disaster recovery plans frequently exist only on paper because full failover tests are disruptive to schedule, coordinate, and validate, so many organizations discover their DR plan does not actually work only during a real outage

Coordinating a DR test involves aligning dozens of stakeholders, sequencing dependent system failovers correctly, and capturing precise recovery time and recovery point measurements against documented objectives

Test results are often recorded informally, making it hard to prove compliance to auditors or to track whether recovery capability is improving or degrading as infrastructure changes

Configuration drift between primary and recovery environments frequently goes undetected between tests, meaning the environment that gets tested is not the one that would actually be used in a real disaster

The agent builds a DR test calendar aligned to compliance and risk requirements, sequences the failover steps for each system based on documented dependencies, and coordinates stakeholder scheduling across infrastructure, application, and business teams. During the test window it captures actual recovery time and recovery point measurements against defined objectives, flags any deviation, and checks for configuration drift between primary and recovery environments discovered along the way. After the test, it compiles a structured report comparing results against targets and tracks remediation items to closure before the next cycle.

1

Test Planning and Scheduling

  • Build a DR test calendar aligned to compliance cadence
  • Sequence failover steps based on system dependencies
  • Coordinate stakeholder availability across teams
  • Confirm rollback procedures before the test window opens
Outcome: A fully sequenced, stakeholder-confirmed DR test plan ready for execution.
2

Pre-Test Drift Detection

  • Compare primary and recovery environment configurations
  • Flag version, patch, or capacity mismatches
  • Verify recovery environment data replication currency
  • Confirm test scope covers all in-scope critical systems
Outcome: Configuration drift is caught and resolved before it invalidates test results.
3

Failover Execution and Measurement

  • Coordinate the live failover sequence per the test plan
  • Capture actual recovery time against the RTO target
  • Capture data currency against the RPO target
  • Log any manual intervention required during failover
Outcome: Precise, evidence-backed measurement of actual recovery capability.
4

Reporting and Remediation Tracking

  • Compile results against documented recovery objectives
  • Flag failed or degraded components for remediation
  • Assign and track remediation items to closure
  • Generate compliance-ready evidence for auditors
Outcome: A documented, auditable trail proving recovery capability or identifying gaps to fix.
ServiceNow
Azure Site Recovery
VMware SRM
PagerDuty
Confluence
AWS Backup